BP Holstein Truss Spar Deepwater Production Platform

Goyne was responsible for the strength and fatigue analysis of various structures located in the hard tank and truss areas of the spar platform for Technip.  Goyne performed strength and fatigue analysis of the:
  • Top-tensioned riser support structure,
  • Heave plates,
  • Hard tank riser guides,
  • SCR porches at soft tank.
In addition, Goyne supported construction activities at the shipyard with design and analysis of various construction and load-out aids.
Year: 2003 - 2005 Client: Technip
Fields: structural analysis, FEA, optimization, fatigue analysis

Other Projects